Legal Opinion on the possible financing scheme of the Plomin C Coal-fired Power Plant (Croatia) and its compatibility with the state aid and public procurement rules of the European Union

5 pages, pdf
 Download Back

 

 Legal Opinion on the possible financing scheme of the Plomin C Coal-fired Power Plant (Croatia) and its compatibility with the state aid and public procurement rules of the European Union

Publisher: CEE Bankwatch Network

Volume: 5 pages, pdf

Description:

The Croatian Electricity Company Hrvatska Elektroprivreda d.d. (HEP) is planning the expansion of the already existing so-called Plomin A and Plomin B3 CPP complex with a third CPP to be named Plomin C. Plomin A exists since 1969 while Plomin B exists since 2000. The capacity of Plomin A is 120 MW while the capacity of Plomin B is 210 MW4. The planned Plomin C plant would introduce an additional 500 MW electricity generating capacity by 2019.