Analysis on the compliance of the environmental permit for Stanari thermal power plant with EU Directives

13 pages, pdf
 Download Back

 

 Analysis on the compliance of the environmental permit for Stanari thermal power plant with EU Directives

Publisher: Center for Environment

Volume: 13 pages, pdf

Description:

This scientific analysis describes the compliance of the environmental permit for the planned Stanari Power Plant in Bosnia and Herzegovina, issued on 19th May 2008 and then changed on 22nd September 2010 by the Ministry of Spatial Planning, Construction and Environment of the Republika Srpska Entity, (hereafter called the “Stanari PP Environmental Permit”) 1) – with some currently valid directives of the European Union, regulating industrial emissions and their environmental impact.