Skip Navigation LinksCSL home > Library > Document

BANKWATCH MAIL 51

w

Bankwatch Mail 51

7 pages, pdf
 Download Back

 Bankwatch Mail 51

Publisher: CEE Bankwatch Network

Volume: 7 pages, pdf

Description:

Fresh controversy hit the proposed 600 MW lignite power plant at Šoštanj in Slovenia in late February when the Slovenian State Commission for the Prevention of Corruption issued a report in which it says corruption conditions existed at the time of the awarding of the construction contract to French company Alstom and continue to exist today. The Commission report also states that Slovenian lobbying legislation has been breached by the goings-on at Šoštanj.